If this is you
An SLC 500 still runs the line
It works today. A failed processor means a used part at a high price, or a long stop.
Get started
×Tell us about the line. A person reads it and replies.
Or talk it through first:
30-minute Google Meet call, Monday to Friday, 9 am to 5 pm Pacific.
Need a full study of the line first?
Rockwell stopped selling the last SLC 5/05 processors on March 31, 2024. We move your SLC 500 logic to CompactLogix, keep the 1746 I/O and field wiring where we can, and cut over on a weekend.
Line down? Tell us, and we respond the same day for a line-down emergency.
Who it is for
If this is you
It works today. A failed processor means a used part at a high price, or a long stop.
If this is you
A dim screen, dead touch, or a terminal you can no longer buy new.
If this is you
Or nowhere. Nobody is sure the copy you have matches what is running.
What you get
Rockwell lists the 1747-AENTR adapter as end of life, with a discontinued date of February 15, 2027 (Rockwell product page). If your path uses it, plan the purchase before then.
How it works
Tell us about the system, a 20-minute call, then a written, fixed quote within 2 business days. See how every JM project starts.
A rescue starts with a line or legacy assessment. If you go ahead, the assessment fee comes off the rescue quote. How an assessment works.
We set the fixed price only after the assessment. Undocumented code is the main reason migrations go over budget. Electrical installation is not in the starting price; when a job needs field wiring, it is quoted with a licensed electrical contractor. PLC-5 (RSLogix 5) moves to ControlLogix and is a different job: tell us about it in the form.
Starting price
These prices cover the scope above. You get a written, fixed quote before any work starts.
Starting price
From $18,500 labor, plus hardware
Hardware is passed through and quoted separately.
Starting price
From $7,500 labor, plus terminal
Terminal quoted separately.
Starting price
From $12,500 labor
Screens rebuilt from photos and the PLC program.
Add-ons
Add-on
Move to newer I/O with conversion cables that keep the field wiring. Quoted per module.
Quoted with the job
Add-on
Bridging or replacing older networks. Quoted after the assessment.
Quoted with the job
Add-on
Backups, remote help and a yearly health check. See Support plans.
Quoted with the job
Proof